End Projects

REPUBLIC OF TURKEY ESKİŞEHİR METROPOLITAN MUNICIPALITY DIRECTORATE GENERAL OF DRINKING WATER AND SEWERAGE ADMINISTRATION CONSTRUCTION OF 1. AND 2. FACE OF EMEK DISTRICT SEWAGE AND DRINKING WATER FACILITYIES.

55 km Sewage network, 56 km drinking water network and 3500 subscriber’s work are completed in 260 days

REPUBLIC OF TURKEY MINISTRY OF TRANSPORTATIN DIRECTORATE GENERAL OF THE RAILWAYS, PORTS AND AIRPORTS CONSTRUCTION ADMINISTRATION FISHING PORT, BEŞİKDÜZÜ TRABZON

Beşikdüzü Fishing Port has been completed in 3 months and taken into service.

GAZİOSMANPAŞA MAYORALITY, İSTANBUL 50. YIL DISTRICT 4. REGION ROAD CONSTRUCTION

3 km road in 50. Yıl District has been completed in 8 months with all retaining walls, curbs, and it is put into service.

GAZİOSMANPAŞA MAYORALITY, İSTANBUL CONSTRUCTION OF KÜÇÜKKÖY PERMANENT MARKET SPACE

The construction of 5-floored permanent market space on a 2.000 sqm closed area was completed with concrete frame and it was put into service.

İSTANBUL METROPOLİTAN MAYORALITY DIRECTORATE GENERAL OF İ.E.T.T. ENTERPRISES ANATOLIAN 1. POOL 3. LEVEL CONSTRUCTION, KADIKÖY İSTANBUL

It is a facility procured by Directorate General of İ.E.T.T. Enterprises on a 1.500 m2 closed area with steel construction building system.

İSTANBUL METROPOLİTAN MAYORALITY DIRECTORATE GENERAL OF İ.E.T.T. ENTERPRISES RESTORATION OF THE HANGAR IN TOPKAPI SURDIŞI, FATİH İSTANBUL

The 1.400 m2 abandoned hangar was restored, landscaping works are complete and it is put into service.

EMPERYAL TRADE CENTER, BAĞCILAR İSTANBUL

The Trade Center is constructed on 15.000 sqm area in total with 3 underground, 5 above ground floors in Güneşli, Bağcılar/İstanbul. System was constructed with elements of Concrete frames and Pre-stressed Hollow Core Slabs and completed in 9 months.

ÇARDAK MAYORALITY, DENİZLİ SOCIAL FACILITY IN SARAY DISTRICT, KÜÇÜK SANAYİ SİTE

The social facility was constructed on 1.800 sqm closed area with concrete pre-cast elements construction in 110 days and put into service.

ÖZDEMİR SABANCI O.I.Z. CONSTRUCTION OF ÇAĞTEK RUBBER FACTORY, ÇARDAK DENİZLİ

The 2-storeyed factory was constructed on 5.500 sqm closed space with concrete pre-cast elements in 180 days and put into service.

CONSTRUCTION OF 1. O.I.Z WASTEWATER INFRASTRUCTURE

6260 m concrete pipe laying complete with manholes for the discharge of treated waste water to Menderes River.

JOKEY CLUB OF TURKEY CONSTRUCTION OF INFRASTUCTURE AND LANDSCAPE OF VELİEFENDİ HIPPODROME

Construction works of infrastructure and landscaping of Veliefendi Hippodrome was completed.

Ministry of Industry and Trade

İzmit Industrial Estate Part One- İzmit Industrial Estate Part Two

Tradesmen Union of Denizli

Denizli Shopping Center

Turkish Real Estate and Credit Bank

Ataköy Mass Housing

İzmit Municipality

İzmit Municipality Building

Nato Infrastructure Department

Nato Ammunition and Torpedo Depots - Igloo Type Ammunition Depots

United States Air Force

Family Hoising and Related Facilities - Incirlik Hotel - Telephone Network - Cable Television Network - Child Care, Arts and Crafts Centre, Base Packing, Store, Relocate VASI lights, Paved Roads, Covered Walkways, Navaids Maintenance, Ice Plant - Communication Building

Ministry of Defence

Ankara Housing for Ministery of Defence

Turkish Air Force

Gökçeada Radars Buildings

Turkish Real Estate and Credit Bank

Erzurum Deprem Konutları

Turkish Ministry of Public Works & Resettlement

İstanbul Dormitory Building with 2900 Beds - Edirne Dormitory Building with 600 Beds - Halkalı Police Housing

Çukurova Cement Factory Construction Inc.

Adana Cement Factory Housing

University of Bosphorous

500 Beds Student Dormitory

İstanbul Metropolitan Municipality

Kadıköy Wholesalers Shopping Center - İstanbul Wholesalers Shopping Center - Mecidiyeköy Park House - Kadıköy Wholesalers Shopping Center - Bostancı-Maltepe Coast Reclamation - Kadıköy-Dalyan-Bostancı Coast Reclamation - Taksim-Tarlabaşı Highway

Türk Hoechst A.Ş.

Municipality Bus Garage

Construction Cooperative of Officials of İstanbul Metropolitan Municipality

Kozyatağı Family Housing 864 Units

SS. Evren Küçük Sanayii Sitesi

Industrial Estate 1000 Units

Evren Industrial Estate Union

İ.T.Ü. Campus New Faculty Buildings

İstanbul Municipality Conservatory Members Union

Göksu Family Housing 1150 Units Including Infrastructure of the Area

Turkish Highway authority 17 District

Gültepe Under Pass Connection Roads

Kadıköy Municipality

Kadıköy Square and Haydarpaşa-Kadıköy Coast Reclamation

Housing Development and Public Participation Administration.

Halkalı Family Housing 365 Units